WSECU Corporate Headquarters | Goudy Construction Company was brought onto the project team midway through the preconstruction process to deliver accurate estimating and constructability review. Building in a congested downtown environment required developing a site plan to minimize disruption to the neighborhood. The six story structure was completed in 12 months.
Go To Detail
St Louise School and Faith Formation Center | Goudy Construction Company provided two years of preconstruction services and then completed construction of this 50,000 sf school building in August 2010.
Go To Detail
Highlands Professional Plaza | Goudy Construction Company worked closely with this client for 2 years in preconstruction. Building over and through a wetland area first required creating a specific plan to build an access driveway to the site. The two story
Go To Detail
WSECU Garage | Goudy Construction joined the project team to address schedule and budget concerns. The 160,000 sf garage parks 470 cars and was delivered in 10 months from breaking ground.
Go To Detail
Bel-Red Medical Plaza | Originally designed as a technical office building, Goudy worked closely with the developer on this project to meet the requirements for medical/dental tenant suites. Sitting adjacent to a wetland stream, Goudy Construction Company again worked closely with the local building officials to ensure runn-off and
Go To Detail
OGS BEl-Red Office Building | Goudy Construction Company hit the ground running on our first project. We began construction in January 1999 after 3 months of record rain fall. The sitework required an underground detention vault be built prior to construction of the building. Goudy worked closely with the architect
Go To Detail
Western Pacific Materials Building | Speed on sitework was the key to getting the tilt-up panels erected on schedule. 10,000 cubic yards of fill material was brought in and placed under slab utilities installed before the slab on grade could be placed. Goudy Construction
Go To Detail